About project
Date: 31/05/2021
Client: China Road and Bridge Corporation (CRBC), China
Location: Main pipeline, Podgorica, Montenegro
As water losses were extremely high, without doubt a malfunction existed somewhere on the 600m long section of the pipeline. The challenge in detecting the location of the leak was even greater, if we keep in mind that for the entire process of detecting the location of the leak under low pressure, the „PAN Inzenjering“ team had only 45 minutes. Nevertheless, the expertise of the employees in the field and the enviable organization of the available funds and personnel, contributed to the potential leakage being reduced to 100m in a short period of time.
The location of the leak is reduced to a few dozen meters. Thanks to the significant experience of our team, the leak on this pipeline was very precisely located and the damage was soon eliminated.